AS AT 174 JAN NOON TOTAL NO. OF CRACKED EQUIPMENT FOUND AFTER NDT PROGRESS OF APPLYING NYLONS PROGRESS OF INSTALLING SECONDARY SUPPORT
MAJOR ITEM NO. OF EQUIPMENT INSPECTED NO. OF EQUIPMENT WITH CRACK FOUND
DC Equipment Case 59 10 0 59 0
Main Equipment Case 57 57 18 57 6 out of 15
Main Compressor 116 116 10 N/A Completed
MA Set 116 116 31 116 0
MA Converter Case 116 84 15 116 58 out of 84
Auxilliary Equipment Case 116 116 72 116 0
Main Transformer 116 18 0 116 0
Battery Charger 84 13 0 84 0
Battery Box 336 52 0 336 0
Cab Air Conditioning Unit 58 3 3 58 0
Compressor Choke 116 116 8 116 0
MA Choke 116 18 0 116 0
Smoothing Inductor 59 10 0 59 0
Total 1465 729 157 1349  
Non-major item          
Traction Motor Mounting 464 24 0 ---  
Brake Unit 348 18 1 ---  
Main Reservoir 792 36 8 By 31/1  
Auxiliary Reservoir 116 6 1 ---  
Surge Suppression Reservoir 1392 72 19 ---  
Wheel Slide Unit 348 18 1 ---  
Brake Caliper 2784 144 0 ---  
APC Antennae 116 6 1 ---  
Resistor Case 116 3 0 ---  
Rectifier Case 59 6 0 59  
Total 6535 333 31 59